{"id":44025,"date":"2022-07-20T19:01:57","date_gmt":"2022-07-20T22:01:57","guid":{"rendered":"https:\/\/guarai.to.gov.br\/portal\/?p=44025"},"modified":"2022-07-20T19:01:59","modified_gmt":"2022-07-20T22:01:59","slug":"edicao-ordinaria-1-417-de-20-de-julho-de-2022","status":"publish","type":"post","link":"https:\/\/guarai.to.gov.br\/portal\/2022\/07\/20\/edicao-ordinaria-1-417-de-20-de-julho-de-2022\/","title":{"rendered":"Edi\u00e7\u00e3o Ordin\u00e1ria 1.417 de 20 de julho de 2022"},"content":{"rendered":"<a href=\"https:\/\/guarai.to.gov.br\/portal\/wp-content\/uploads\/2022\/07\/DOM-1417.pdf\" class=\"pdfemb-viewer\" style=\"width:1200px;height:1500px;\" data-width=\"1200\" data-height=\"1500\" data-toolbar=\"both\" data-toolbar-fixed=\"on\">DOM-1417<\/a>\n<p class=\"wp-block-pdfemb-pdf-embedder-viewer\"><\/p>\n\n\n\n<p><a href=\"http:\/\/EXTRATO DO EDITAL DE LICITA\u00c7\u00c3O P\u00daBLICA PREG\u00c3O PRESENCIAL N.\u00ba 035\/2022  Acha-se aberta na Prefeitura Municipal de Guara\u00ed, licita\u00e7\u00e3o na modalidade de Preg\u00e3o Presencial, objetivando registro de pre\u00e7o para a contrata\u00e7\u00e3o de empresa para eventual fornecimento de emuls\u00e3o asf\u00e1ltica RL-1C e cal hidratado CH-3, para serem utilizados na \u201cOpera\u00e7\u00e3o Tapa Buraco\u201d, manuten\u00e7\u00e3o e recupera\u00e7\u00e3o da malha asf\u00e1ltica vi\u00e1ria urbana do munic\u00edpio, conforme Termo de Refer\u00eancia. Demais especifica\u00e7\u00f5es encontram-se no Edital. Ser\u00e3o observados os seguintes hor\u00e1rios e datas: In\u00edcio da Sess\u00e3o para o credenciamento: \u00e0s 07h30min, do dia 01\/08\/2022, na Sala de Licita\u00e7\u00f5es da Prefeitura Municipal de Guara\u00ed\/TO, situada \u00e0 Av. Bernardo Say\u00e3o, Setor Central de Guara\u00ed\/TO. O Edital poder\u00e1 ser retirado na Sala de Licita\u00e7\u00f5es, no portal eletr\u00f4nico do munic\u00edpio www.guarai.to.gov.br ou ser requisitado via e-mail: licitacao@guarai.to.gov.br  Guara\u00ed\/TO, 20 de julho de 2022.  Cleube Roza Lima Superintendente de Licita\u00e7\u00f5es  EXTRATO DA ATA DE REGISTRO DE PRE\u00c7OS n.\u00ba 144\/2022  Processo: 12\/2022 Preg\u00e3o Presencial n.\u00b0 022\/2022 \u00d3rg\u00e3o: Fundo Municipal de Educa\u00e7\u00e3o de Guara\u00ed-TO.Contratada: PONTUAL REFRIGERA\u00c7\u00c3O COM\u00c9RCIO E SERVI\u00c7OS LTDA, inscrita no CNPJ\/MF sob o n.\u00ba 30.643.835\/0001-20. Objeto: Contrata\u00e7\u00e3o de empresa para eventual presta\u00e7\u00e3o de servi\u00e7os em manuten\u00e7\u00e3o corretiva e preventiva de ar condicionados e outros, para atender as demandas da Secretaria Municipal de Educa\u00e7\u00e3o, Departamentos e Unidades Escolares da Rede Municipal de Ensino de Guara\u00ed\/TO. Signat\u00e1rios:  Sebasti\u00e3o Mendes de Sousa                        Thiago Aguiar Paix\u00e3o Data da Assinatura: 19\/07\/2022  ITEM\tDESCRI\u00c7\u00c3O\tQUANT.\tUNID.\tMARCA\tV. UNIT.\tV. TOTAL 01\tMANUTEN\u00c7\u00c3O PREVENTIVA DE AR SPLIT 9.000 BTU\t15\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t115,00\t1.725,00 02\tMANUTEN\u00c7\u00c3O CORRETIVA AR COND. 9.000 BTU\t15\tUN\tPONTUAL REFRIGERA\u00c7\u00c3O\t125,00\t1.875,00 03\tINSTA\u00c7\u00c3O DE AR COND. SPLIT 9000 BTUS\t3\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t225,00\t675,00 04\tINSTALA\u00c7\u00c3O AR CONDICIONADO 9000 BTUS\t3\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t140,00\t420,00 05\tRETIRADA DE APARELHO DE AR CONDICIONADA 9.000 BTUS\t3\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t55,00\t165,00 06\tCOMPLEMENTA\u00c7\u00c3O DE TUBULA\u00c7\u00c3O DE COBRE E CABEAMENTO\t2\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t160,00\t320,00 07\tSERVI\u00c7O DE M\u00c3O DE OBRA AR CONDICIONADO SEM INCLUS\u00c3O DE G\u00c1S\t2\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t158,00\t316,00 08\tSERVI\u00c7O DE M]AO DE OBRA PARA TROCA OU COMPLEMENTA\u00c7\u00c3O INCLUS\u00c3O DE G\u00c1S ECOL\u00d3GICO\t2\tSV\tDUGOLD\t160,00\t320,00 09\tSERVI\u00c7O DE M\u00c3O DE OBRA PARA TROCA OU COMPLEMENTA\u00c7\u00c3O DE G\u00c1S ECOL\u00d3GICO SEM INCLUS\u00c3O DE G\u00c1S ECOL\u00d3GICO\t2\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t88,00\t176,00 10\tSERVI\u00c7O DE SUBSTITUI\u00c7\u00c3O DE COMPRESSOR AR CONDICIONADO 9.000 BTUS\t2\tSV\tTECUMSH\t1.105,00\t2.210,00 11\tSUBSTITUI\u00c7\u00c3O DE MOTOR DO VENTILADOR E H\u00c9LICE AR 9.000 BTU\t2\tSV\tEOS\t450,00\t900,00 12\tSERVI\u00c7O DE SUBSTITUI\u00c7\u00c3O DE PLACA DE AR 9.0000 BTUS\t2\tSV\tEOS\t435,00\t870,00 13\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETR\u00d4NICA DO DISPLAY AR 9.000 BTUS\t2\tSV\tEOS\t310,00\t620,00 14\tSUBSTITUI\u00c7\u00c3O DE CONTATORA PARA APARELHO DE AR CONDICIONADO 9.000 BTUS\t2\tSV\tWEG\t225,00\t450,00 15\tSUBSTITUI\u00c7\u00c3O DE V\u00c1LVULA DE REVERS\u00c3O AR 9.000\t2\tSV\tEOS\t240,00\t480,00 16\tCONTROLE REMOTO\t2\tUN\tEOS\t70,00\t140,00 17\tSUBSTITUI\u00c7\u00c3O DE KIT BOMBA E BOIA DE DRENO\t2\tSV\tEOS\t460,00\t920,00 18\tREVIS\u00c3O E TROCA DO SENSOR DO AR CONDICIONADO\t2\tSV\tEOS\t130,00\t260,00 19\tSUBSTITUI\u00c7\u00c3O DE COMPRESSOR AR\t2\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t290,00\t580,00 20\tSUBSTITUI\u00c7\u00c3O DE MOTOR DE VENTILADOR E H\u00c9LICE AR\t2\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t125,00\t250,00 21\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETR\u00d4NICA DE COMANDO AR\t2\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t190,00\t380,00 22\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETRONICA DE DISPLAY AR\t2\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t120,00\t240,00 23\tSUBSTITUI\u00c7\u00c3O DE CONTATORA AR SPLIT\t2\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t115,00\t230,00 24\tSUBSTITUI\u00c7\u00c3O DE V\u00c1LVULA DE REVERS\u00c3O SELEN\u00d3IDE E CAPILAR PARA AR\t  2\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t105,00\t210,00 25\tSUBSTITUI\u00c7\u00c3O DE KIT BOMBA AR SEM INCLUS\u00c3O DE KIT BOMBA E BOIA DE DRENO\t 2\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t210,00\t420,00 26\tSUBSTITUI\u00c7\u00c3O DE SENSOR DE TEMPERATURA AR CONDICIONADO SPLIT SEM INCLUS\u00c3O DE SENSOR\t2\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t109,00\t218,00 27\tCARGA DE G\u00c1S AR DE 9000 BTUS\t10\tUN\tDUGOLD\t280,00\t2.800,00 28\tMUDAN\u00c7A DE LOCAL DE AR CONDICIONADO USADO 9.000BTU\t3\tUN\tPONTUAL REFRIGERA\u00c7\u00c3O\t180,00\t540,00 29\tMUDAN\u00c7A DE LOCAL DE AR CONDICIONADO PR\u00c9DIO DISTINTO 9.000 BTUS\t3\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t221,00\t663,00 30\tMANUTEN\u00c7\u00c3O PREVENTIVA\t20\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t135,00\t2.700,00 31\tMANUTEN\u00c7\u00c3O CORRETIVA AR COND. 12.000 BTUS\t20\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t155,00\t3.100,00 32\tINSTALA\u00c7\u00c3O DE AR CONDICIONADO SPLIT 12.000 BTUS\t20\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t280,00\t5.600,00 33\tINSTALA\u00c7\u00c3O DE AR CONDICIONADO USADO 12.000 BTUS\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t150,00\t1.500,00 34\tRETIRADA DE APARELHO DE AR CONDICIONADA 12.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t60,00\t300,00 35\tCOMPLEMENTA\u00c7\u00c3O DE TUBULA\u00c7\u00c3O DE COBRE AR 9.000 BTUS, INCLUINDO M\u00c3O DE OBRA\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t175,00\t1.750,00 36\tSERVI\u00c7O DE M\u00c3O DE OBRA AR CONDICIONADO 12.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t110,00\t550,00 37\tM\u00c3O DE OBRA TROCA OU COMPLEMENTA\u00c7\u00c3O AR 12.000 BTUS\t10\tSV\tDUGOLD\t185,00\t1.850,00 38\tM\u00c3O DE OBRA PARA TROCA OU COMPLEMENTA\u00c7\u00c3O AR 12.000 BTUS SEM INCLUS\u00c3O DE G\u00c1S ECOL\u00d3GICO\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t105,00\t525,00 39\tSUBSTITUI\u00c7\u00c3O DE COMPRESSOR AR 12.000 BTUS\t 5\tSV\tTECUMSH\t1.230,00\t6.150,00 40\tSUBSTITUI\u00c7\u00c3O DE MOTOR DE VENTILADOR E H\u00c9LICE AR 12.000 BTUS\t5\tSV\tEOS\t500,00\t2.500,00 41\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETR\u00d4NICA DE COMANDO AR 12.000 BTUS\t5\tSV\tEOS\t410,00\t2.050,00 42\tSUBSTITUI\u00c7\u00c3O PLACA ELETR\u00d4NICA 12.000 BTUS INCLUINDO PLACA ELETR\u00d4NICA DO DISPLAY E PE\u00c7AS NECESS\u00c1RIAS\t5\tSV\tEOS\t305,00\t1.525,00 43\tSUBSTITUI\u00c7\u00c3O DE CONTATORA AR SPLIT 12.000 BTUS\t5\tSV\tWEG\t280,00\t1.400,00 44\tSUBSTITUI\u00c7\u00c3O DE V\u00c1LVULA DE REVERS\u00c3O AR 12.000 BTUS\t 5\tSV\tEOS\t240,00\t1.200,00 45\tCONTROLE AR CONDICIONADO 12.000 SPLIT\t5\tSV\tEOS\t80,00\t400,00 46\tSUBSTITUI\u00c7\u00c3O KIT BOMBA AR 12.000 BTUS\t5\tSV\tEOS\t480,00\t2.400,00 47\tSUBSTITUI\u00c7\u00c3O SENSOR AR 12.000 BTUS\t5\tSV\tEOS\t195,00\t975,00 48\tSUBSTITUI\u00c7\u00c3O DE COMPRESSOR AR 12.000 BTUS S\/ INCLUS\u00c3O\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t280,00\t1.400,00 49\tSUBSTITUI\u00c7\u00c3O DE MOTOR DE VENTILADOR E H\u00c9LICE AR 12.000 BTUS S\/ INCLUS\u00c3O DO MOTOR E PE\u00c7AS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t180,00\t900,00 50\tSUBSTITUI\u00c7\u00c3O DE PLAA ELETR\u00d4NICA DE COMANDO AR 12.000 BTUS S\/ INCLUS\u00c3O DA PLACA\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t155,00\t775,00 51\tSUBSTIUI\u00c7\u00c3O DE PLACA ELETR\u00d4NICA AR 12.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t150,00\t750,00 52\tSUBSTITUI\u00c7\u00c3O DE CONTATORA AR SPLIT 12.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t120,00\t600,00 53\tSUBSTITUI\u00c7\u00c3O DE V\u00c1LVULA DE REVERS\u00c3O AR 12.000 BTUS S\/ INCLUS\u00c3O DE V\u00c1LVULA DE REVERS\u00c3O\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t125,00\t625,00 54\tSUBSTITUI\u00c7\u00c3O KIT BOMBA AR 12.000 BTUS S\/ INCLUS\u00c3O DO KIT BOMBA\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t210,00\t1.050,00 55\tSUBSTITUI\u00c7\u00c3O DE SENSOR DE TEMPERATURA AR 12.000 BTUS S\/ INCLUS\u00c3O DO SENSOR\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t110,00\t550,00 56\tCARGA DE G\u00c1S R22 EM AR 12.000BTU\t10\tUN\tDUGOLD\t250,00\t2.500,00 57\tMUDAN\u00c7A DE LOCAL AR CONDICIONADO 12.000 MESMO PR\u00c9DIO COM REPOSI\u00c7\u00c3O DE G\u00c1S\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t180,00\t900,00 58\tMUDAN\u00c7A DE LOCAL DE AR CONDICIONADO 12.000 BTUS PR\u00c9DIO DISTINTO\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t210,00\t1.050,00 59\tMANUTEN\u00c7\u00c3O PREVENTIVA AR COND. 18.000 BTU\t30\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t180,00\t5.400,00 60\tMANUTEN\u00c7\u00c3O CORRETIVA AR COND. 18.000 BTU\t30\tUN\tPONTUAL REFRIGERA\u00c7\u00c3O\t180,00\t5.400,00 61\tINSTALA\u00c7\u00c3O AR CONDICIONADO 18.000 BTUS C\/ SUPORTE\t15\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t340,00\t5.100,00 62\tINSTALA\u00c7\u00c3O AR COND. 18.000 USADO BTUS COM ISOLAMENTOS\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t230,00\t2.300,00 63\tRETIRADA AR CONDICIONADO 18.000 BTUS\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t70,00\t700,00 64\tCOMPLEMENTA\u00c7\u00c3O TUBULA\u00c7\u00c3O AR 18.000\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t200,00\t2.000,00 65\tM\u00c3O DE OBRA PARA COMPLEMENTA\u00c7\u00c3O AR 18.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t90,00\t450,00 66\tM\u00c3O DE OBRA PARA TROCA AR COND. 18.000 BTUS\t10\tSV\tDUGOLD\t220,00\t2.200,00 67\tM\u00c3O DE OBRA PARA TROCA OU COMPLEMENTA\u00c7\u00c3O AR 12.000 SEM INCLUS\u00c3O DE G\u00c1S\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t100,00\t1.000,00 68\tSUBSTITUI\u00c7\u00c3O COMPRESSOR 18.000 BTUS\t10\tSV\tTECUMSH\t1.580,00\t15.800,00 69\tSUBSTITUI\u00c7\u00c3O DE MOTOR AR COND. 18.000 BTUS\t10\tSV\tEOS\t560,00\t5.600,00 70\tSUBSTITUI\u00c7\u00c3O PLACA ELETR\u00d4NICA AR 18.000 BTUS\t5\tSV\tEOS\t560,00\t2.800,00 71\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETR\u00d4NICASR 18.000\t5\tSV\tEOS\t420,00\t2.100,00 72\tSUBSTITUI\u00c7\u00c3O DE CONTATORA AR COND 18.000 BTUS\t5\tSV\tWEG\t320,00\t1.600,00 73\tSUBSTITUI\u00c7\u00c3O DE V\u00c1LVULA DE REVERS\u00c3O AR 18.000 BTUS\t5\tSV\tEOS\t260,00\t1.300,00 74\tCONTROLE REMOTO\t5\tUN\tEOS\t90,00\t450,00 75\tSUBSTITUI\u00c7\u00c3O KIT BOMBA AR COND. 18.000 BTUS\t5\tSV\tEOS\t520,00\t2.600,00 76\tSUBSTITUI\u00c7\u00c3O DE SENSOR DE TEMPERATURA AR 18.000\t5\tSV\tEOS\t250,00\t1.250,00 77\tSUBSTITUI\u00c7\u00c3O DE COMPRESSOR AR 18.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t1.680,00\t8.400,00 78\tSUBSTITUI\u00c7\u00c3O DE MOTOR DO VENT. E H\u00c9LICE AR 18.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t200,00\t1.000,00 79\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETR\u00d4NICO DE COMANDO AR 18.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t225,00\t1.125,00 80\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETR\u00d4NICA DO DISPLAY AR 18.000\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t180,00\t900,00 81\tSUBSTITUI\u00c7\u00c3O DE CONTATORA S\/ INCLUS\u00c3O AR 18.000\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t250,00\t1.250,00 82\tSUBSTITUI\u00c7\u00c3O DE V\u00c1LVULA DE REVERS\u00c3O AR 18.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t180,00\t900,00 83\tSUBSTITUI\u00c7\u00c3O DE KIT BOMBA AR COND. 18.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t155,00\t775,00 84\tSUBSTITUI\u00c7\u00c3O DE SENSOR DE TEMPERATURA AR 18.000\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t100,00\t500,00 85\tCARGA DE G\u00c1S R22 EM AR 18.000BTU\t20\tUN\tDUGOLD\t550,00\t11.000,00 86\tMUDAN\u00c7A DE LOCAL AR COND. 18.000 BTUS NO MESMO PR\u00c9DIO\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t380,00\t3.800,00 87\tMUDAN\u00c7A DE LOCAL AR COND.18.000 BTUS EM PR\u00c9DIO DISTINTO\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t340,00\t3.400,00 88\tMANUTEN\u00c7\u00c3O PREVENTIVA AR COND. 24000 BTU\t25\tUN\tPONTUAL REFRIGERA\u00c7\u00c3O\t220,00\t5.500,00 89\tMANUTEN\u00c7\u00c3O CORRETIVA AR COND. 24.000 BTU\t25\tUN\tPONTUAL REFRIGERA\u00c7\u00c3O\t210,00\t5.250,00 90\tINSTALA\u00c7\u00c3O AR COND. SPLIT 24000 BTUS\t15\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t400,00\t6.000,00 91\tINSTALA\u00c7\u00c3O AR CONDICIONADO 24.000 BTUS USADO\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t280,00\t2.800,00 92\tRETIRADA DE AR CONDICIONADO 24.000 BTUS\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t95,00\t950,00 93\tCOMPLEMENTA\u00c7\u00c3O DE TUBULA\u00c7\u00c3O AR CONDICIONADO 24.000\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t250,00\t2.500,00 94\tM\u00c3O DE OBRA CPMPL. DE TUBULA\u00c7\u00c3O AR 24.000\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t150,00\t1.500,00 95\tM\u00c3O DE OBRA PARA TROCA OU COMPLEMENTA\u00c7\u00c3O AR 24.000\t10\tSV\tDUGOLD\t300,00\t3.000,00 96\tM\u00c3O DE OBRA PARA TROCA OU COMPLEMENTA\u00c7\u00c3O AR 24.000 SEM INCLUS\u00c3O DE G\u00c1S\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t190,00\t950,00 97\tSUBSTITUI\u00c7\u00c3O DE COMPRESSOR AR 24.000 BTUS\t10\tSV\tTECUMSH\t1.860,00\t18.600,00 98\tSUBSTITUI\u00c7\u00c3O DE MOTOR DO VENT. E H\u00c9LICE AR 24.000\t10\tSV\tEOS\t580,00\t5.800,00 99\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETR\u00d4NICA DE COMANDO AR 24.000 BTUS COM INCLUS\u00c3O DE PLACA ELETR\u00d4NICA\t10\tSV\tEOS\t550,00\t5.500,00 100\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETR\u00d4NICA DO DISPLAY 24.000 BTUS\t10\tSV\tEOS\t700,00\t7.000,00 101\tSUBSTITUI\u00c7\u00c3O DE CONTATORA AR COND 24.000 BTUS\t5\tSV\tWEG\t450,00\t2.250,00 102\tSUBSTITUI\u00c7\u00c3O DE V\u00c1LVULA DE REVERS\u00c3O AR 24.000\t5\tSV\tEOS\t410,00\t2.050,00 103\tCONTROLE REMOTO AR CONDICIONADO 24.000 BTUS\t5\tSV\tEOS\t125,00\t625,00 104\tSUBSTITUI\u00c7\u00c3O KIT BOMBA AR 24.000 BTUS\t10\tSV\tEOS\t600,00\t6.000,00 105\tSUBSTITUI\u00c7\u00c3O DE SENSOR DE TEMPERATURA AR 24.000 BTUS\t5\tSV\tEOS\t200,00\t1.000,00 106\tSUSBTITUI\u00c7\u00c3O DE COMPRESSOR AR COND. 24.000 BTU\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t360,00\t1.800,00 107\tSUBSTITUI\u00c7\u00c3O DE MOTOR DE VENTILADOR E H\u00c9LICE AR 24.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t185,00\t925,00 108\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETR\u00d4NICA DE COMANDO AR 24.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t170,00\t850,00 109\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETRONICA DE DISPLAY AR 24.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t180,00\t900,00 110\tSUBSITUI\u00c7\u00c3O DE CONTATORA AR CONDICIONADO 24.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t200,00\t1.000,00 111\tSUSBTITUI\u00c7\u00c3O DE V\u00c1LVULA DE REVERS\u00c3O AR 24.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t138,00\t690,00 112\tSUBSTITUI\u00c7\u00c3O DE KIT BOMBA AR COND. 24.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t190,00\t950,00 113\tSUBSTITUI\u00c7\u00c3O DE SENSOR DE TEMPERATURA AR 24.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t150,00\t750,00 114\tCARGA DE G\u00c1S AR DE 24000 BTUS\t15\tUN\tDUGOLD\t400,00\t6.000,00 115\tMUDAN\u00c7A DE LOCAL AR CONDICIONADO 24.000 MESMO PR\u00c9DIO\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t600,00\t6.000,00 116\tMUDAN\u00c7A DE LOCAL DE AR CONDICIONADO AR 24.000 BTUS PR\u00c9DIO DISTINTO\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t600,00\t6.000,00 117\tMANUTEN\u00c7\u00c3O PREVENTIVA AR CONDICIONADO 30.000 BTUS\t30\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t300,00\t9.000,00 118\tMANUTEN\u00c7\u00c3O CORRETIVA AR COND. 30.000 BTU\t30\tUN\tPONTUAL REFRIGERA\u00c7\u00c3O\t220,00\t6.600,00 119\tINSTALA\u00c7\u00c3O AR COND. SPLIT 30000 BTUS\t20\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t405,00\t8.100,00 120\tINSTALA\u00c7\u00c3O AR CONDICIONADO 30.000 BTUS USADO\t15\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t330,00\t4.950,00 121\tRETIRADA DE APARELHO DE AR CONDICIONADA 30.000 BTU\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t150,00\t1.500,00 122\tCOMPLEMENTA\u00c7\u00c3O DE TUBULA\u00c7\u00c3O AR CONDICIONADO 30.000\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t300,00\t3.000,00 123\tM\u00c3O DE OBRA PARA TROCA OU COMPLEMENTA\u00c7\u00c3O AR 30.000\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t220,00\t2.200,00 124\tM\u00c3O DE OBRA PARA TROCA OU COMPLEMENTA\u00c7\u00c3O AR 30.000 INCLUINDO G\u00c1S\t20\tSV\tDUGOLD\t310,00\t6.200,00 125\tM\u00c3O DE OBRA PARA TROCA OU COMPLEMENTA\u00c7\u00c3O AR 30.000 SEM INCLUS\u00c3O DE G\u00c1S\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t155,00\t1.550,00 126\tSUBSTITUI\u00c7\u00c3O DE COMPRESSOR AR 30.000 BTUS\t15\tSV\tTECUMSH\t2.000,00\t30.000,00 127\tSUBSTITUI\u00c7\u00c3O DE MOTOR DO VENT. E H\u00c9LICE AR 30.000 BTUS\t15\tSV\tEOS\t700,00\t10.500,00 128\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETR\u00d4NICA DE COMANDO AR CONDICIONADO 30.000 BTUS\t10\tSV\tEOS\t855,00\t8.550,00 129\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETRONICA DE DISPLAY AR 30.000 BTUS\t10\tSV\tEOS\t850,00\t8.500,00 130\tSUBSTITUI\u00c7\u00c3O DE CONTATORA AR COND 30.000 BTUS\t10\tSV\tWEG\t310,00\t3.100,00 131\tSUBSTITUI\u00c7\u00c3O DE V\u00c1LVULA DE REVERS\u00c3O AR 30.000 BTUS\t10\tSV\tEOS\t500,00\t5.000,00 132\tCONTROLE REMOTO AR CONDICIONADO 30.000TUS\t5\tSV\tEOS\t125,00\t625,00 133\tSUBSTITUI\u00c7\u00c3O KIT BOMBA AR 30.000 BTUS S\/ INCLUS\u00c3O\t10\tSV\tEOS\t750,00\t7.500,00 134\tSUBSTITUI\u00c7\u00c3O DE SENSOR DE TEMPERATURA AR 30.000\t5\tSV\tEOS\t200,00\t1.000,00 135\tSUBSTITUI\u00c7\u00c3O DE COMPRESSOR AR 30.000 BTUS\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t2.250,00\t22.500,00 136\tSUBSTITUI\u00c7\u00c3O DE MOTOR DO VENT. E H\u00c9LICE AR 30.000\t10\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t280,00\t2.800,00 137\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETR\u00d4NICA DE COMANDO AR 30.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t222,00\t1.110,00 138\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETRONICA DE DISPLAY AR 30.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t190,00\t950,00 139\tSUBSTITUI\u00c7\u00c3O DE CONTATORA AR COND 30.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t195,00\t975,00 140\tSUBSTITUI\u00c7\u00c3O DE V\u00c1LVULA DE REVERS\u00c3O AR 30.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t230,00\t1.150,00 141\tSUBSTITUI\u00c7\u00c3O DE KIT BOMBA AR COND. 30.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t220,00\t1.100,00 142\tSUBSTITUI\u00c7\u00c3O DE SENSOR DE TEMPERATURA AR 30.000 BTUS\t5\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t150,00\t750,00 143\tCARGA DE G\u00c1S R22 EM AR 30.000BTU\t30\tUN\tDUGOLD\t450,00\t13.500,00 144\tMUDAN\u00c7A DE LOCAL AR CONDICIONADO 30.000 BTUS NO MESMO LOCAL\t15\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t555,00\t8.325,00 145\tMUDAN\u00c7A DE LOCAL DE AR CONDICIONADO 30.000 BTUS PR\u00c9DIO DISTINTO\t15\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t600,00\t9.000,00 146\tMANUTEN\u00c7\u00c3O PREVENTIVA AR COND. 60.000 BTU\t05\tUN\tPONTUAL REFRIGERA\u00c7\u00c3O\t650,00\t3.250,00 147\tMANUTEN\u00c7\u00c3O CORRETIVA AR COND. 60.000 BTU\t05\tUN\tPONTUAL REFRIGERA\u00c7\u00c3O\t590,00\t2.950,00 148\tINSTALA\u00c7\u00c3O AR CONDICIONADO 60.000 BTUS C\/ SUPORTE\t04\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t780,00\t3.120,00 149\tINSTALA\u00c7\u00c3O AR CONDICIONADO 60.000 BTUS USADO\t04\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t620,00\t2.480,00 150\tRETIRADA APARELHO AR CONDICIONADO 60.000 BTUS\t02\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t320,00\t640,00 151\tCOMPLEMENTA\u00c7\u00c3O DE TUBULA\u00c7\u00c3O AR CONDICIONADO 60.000\t02\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t580,00\t1.160,00 152\tM\u00c3O DE OBRA PARA COMPLEMENTA\u00c7\u00c3O AR 60.000 BTUS\t02\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t290,00\t580,00 153\tM\u00c3O DE OBRA PARA TROCA OU COMPLEMENTA\u00c7\u00c3O AR 60.000\t02\tSV\tDUGOLD\t700,00\t1.400,00 154\tM\u00c3O DE OBRA PARA TROCA OU COMPLEMENTA\u00c7\u00c3O AR 60.000 SEM INCLUS\u00c3O DE G\u00c1S\t02\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t380,00\t760,00 155\tSUBSTITUI\u00c7\u00c3O DE COMPRESSOR AR 60.000 BTUS\t02\tSV\tTECUMSH\t2.800,00\t5.600,00 156\tSUBSTITUI\u00c7\u00c3O DE MOTOR DO VENT. E H\u00c9LICE AR 60.000 BTUS\t02\tSV\tEOS\t950,00\t1.900,00 157\tSUBSTITUI\u00c7\u00c3O DE PLACA DE COMANDO AR 60.000 BTUS\t02\tSV\tEOS\t2.400,00\t4.800,00 158\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETRONICA DE DISPLAY AR 60.000 BTUS\t02\tSV\tEOS\t2.650,00\t5.300,00 159\tSUBSTITUI\u00c7\u00c3O DE CONTATORA AR COND 60.000 BTUS\t02\tSV\tWEG\t680,00\t1.360,00 160\tSUBSTITUI\u00c7\u00c3O DE V\u00c1LVULA DE REVERS\u00c3O AR 60.000 BTUS\t02\tSV\tEOS\t740,00\t1.480,00 161\tCONTROLE REMOTO AR CONDICIONADO 60.000TUS\t02\tSV\tEOS\t160,00\t320,00 162\tSUBSTITUI\u00c7\u00c3O KIT BOMBA AR COND. 60.000 BTUS\t02\tSV\tEOS\t800,00\t1.600,00 163\tSUBSTITUI\u00c7\u00c3O DE SENSOR DE TEMPERATURA AR 60.000\t02\tSV\tEOS\t200,00\t400,00 164\tSUBSTITUI\u00c7\u00c3O DE COMPRESSOR AR 60.000 BTUS\t02\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t850,00\t1.700,00 165\tSUBSTITUI\u00c7\u00c3O DE MOTOR DO VENT. E H\u00c9LICE AR 60.000 BTUS\t02\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t440,00\t880,00 166\tSUBSTITUI\u00c7\u00c3O DE PLACA ELET. DE COMANDO AR 60.000\t02\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t550,00\t1.100,00 167\tSUBSTITUI\u00c7\u00c3O DE PLACA ELETRONICA DE DISPLAY AR 60.000 BTUS\t02\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t655,00\t1.310,00 168\tSUBSTITUI\u00c7\u00c3O DE CONTATORA AR COND 60.000 BTUS\t02\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t100,00\t200,00 169\tSUBSTITUI\u00c7\u00c3O DE V\u00c1LVULA DE REVERS\u00c3O AR 60.000 BTUS.  SEM INCLUS\u00c3O DE V\u00c1LVULA\t02\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t200,00\t400,00 170\tSUBSTITUI\u00c7\u00c3O DE KIT BOMBA AR COND. 60.000 BTUS. SEM INCLUS\u00c3O DE KIT\t02\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t220,00\t440,00 171\tSUBSTITUI\u00c7\u00c3O DE SENSOR DE TEMPERATURA AR 60.000. SEM INCLUS\u00c3O DO SENSOR\t02\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t200,00\t400,00 172\tCARGA DE G\u00c1S 60.000 BTU\t04\tUN\tDUGOLD\t650,00\t2.600,00 173\tMUDAN\u00c7A DE LOCAL DE AR CONDICIONADO 60.000 BTUS MESMO LOCAL\t03\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t740,00\t2.220,00 174\tMUDAN\u00c7A DE LOCAL DE AR CONDICIONADO 60.000 BTUS. PR\u00c9DIO DISTINTO\t03\tSV\tPONTUAL REFRIGERA\u00c7\u00c3O\t840,00\t2.520,00 TOTAL\tR$ 494.093,00  Sebasti\u00e3o Mendes de Sousa  Gestor do Fundo Municipal de Educa\u00e7\u00e3o      EXTRATO DA ATA DE REGISTRO DE PRE\u00c7OS n.\u00ba 142\/2022  Processo: 1743\/2022 Preg\u00e3o Presencial 032\/2022 \u00d3rg\u00e3o: Fundo Municipal de Sa\u00fade de Guara\u00ed-TO.Contratada: ARCOS SEVI\u00c7OS URBANOS EIRELI, inscrita no CNPJ\/MF sob o n.\u00ba 07.477.752\/0001-97. Objeto: Contrata\u00e7\u00e3o de empresa para eventual fornecimento de pessoal qualificado, por hora trabalhada, para desempenhar atividade de pedreiro, encanador, eletricista, pintor, serralheiro, jardineiro, gesseiro, vidraceiro, marmorista, carpinteiro, marceneiro, servente e ajudante para manuten\u00e7\u00e3o predial e reparos em geral de pr\u00e9dios p\u00fablicos em geral da Secretaria Municipal de Sa\u00fade. Signat\u00e1rios:  Wellington de Sousa Silva                        Stefanio Pereira Borges Data da Assinatura: 14\/07\/2022  ITEM\tDESCRI\u00c7\u00c3O\tQUANT.\tUNID.\tMARCA\tV. UNIT.\tV. TOTAL 01\tENCANADOR OU BOMBEIRO HIDR\u00c1ULICO COM ENCARGOS COMPLEMENTARES.\t300\tHR\tSERVI\u00c7OS\t29,49\t8.847,00 02\tPEDREIRO COM ENCARGOS COMPLEMENTARES.\t900\tHR\tSERVI\u00c7OS\t27,22\t24.498,00 03\tELETRICISTA COM ENCARGOS COMPLEMENTARES.\t500\tHR\tSERVI\u00c7OS\t29,90\t14.950,00 04\tPINTOR COM ENCARGOS COMPLEMENTARES.\t1000\tHR\tSERVI\u00c7OS\t30,88\t30.880,00 05\tAJUDANTE DE OPERA\u00c7\u00c3O EM GERAL COM ENCARGOS COMPLEMENTARES.\t900\tHR\tSERVI\u00c7OS\t22,69\t20.421,00 06\tSERRALHEIREIRO COM ENCARGOS COMPLEMENTARES.\t100\tHR\tSERVI\u00c7OS\t27,06\t2.706,00 07\tJARDINEIRO COM ENCARGOS COMPLEMENTARES.\t600\tHR\tSERVI\u00c7OS\t22,61\t13.566,00 08\tGESSEIRO COM ENCARGOS COMPLEMENTARES.\t120\tHR\tSERVI\u00c7OS\t26,30\t3.156,00 09\tVIDRACEIRO COM ENCARGOS COMPLEMENTARES.\t120\tHR\tSERVI\u00c7OS\t24,61\t2.953,20 10\tMARMORISTA\/GRANITEIRO COM ENCARGOS COMPLEMENTARES.\t100\tHR\tSERVI\u00c7OS\t27,12\t2.712,00 11\tCARPINTEIRO DE FORMAS COM ENCARGOS COMPLEMENTARES.\t50\tHR\tSERVI\u00c7OS\t27,44\t1.372,00 12\tCARPINTEIRO DE ESQUADRIAS COM ENCARGOS COMPLEMENTARES.\t50\tHR\tSERVI\u00c7OS\t26,20\t1.310,00 13\tSERVENTE COM ENCARGOS COMPLEMENTARES.\t900\tHR\tSERVI\u00c7OS\t20,99\t18.891,00 14\tMARCENEIRO COM ENCARGOS COMPLEMENTARES.\t100\tHR\tSERVI\u00c7OS\t25,90\t2.590,00 TOTAL\tR$148.852,20 Wellington de Sousa Silva  Gestor do Fundo Municipal de Sa\u00fade   EXTRATO DO EDITAL DE LICITA\u00c7\u00c3O P\u00daBLICA PREG\u00c3O PRESENCIAL N.\u00ba 038\/2022  Acha-se aberta na Prefeitura Municipal de Guara\u00ed, licita\u00e7\u00e3o na modalidade de Preg\u00e3o Presencial, objetivando registro de pre\u00e7o para eventual contrata\u00e7\u00e3o de empresa para eventual fornecimento parcelado de areia, brita n\u00ba 1. Seixo e terra preta, de acordo com demandas, para atender as necessidades da Prefeitura Municipal e Fundo Municipal de Educa\u00e7\u00e3o do munic\u00edpio, conforme Termo de Refer\u00eancia. Demais especifica\u00e7\u00f5es encontram-se no Edital. Ser\u00e3o observados os seguintes hor\u00e1rios e datas: In\u00edcio da Sess\u00e3o para o credenciamento: \u00e0s 14h00min, do dia 01\/08\/2022, na Sala de Licita\u00e7\u00f5es da Prefeitura Municipal de Guara\u00ed\/TO, situada \u00e0 Av. Bernardo Say\u00e3o, Setor Central de Guara\u00ed\/TO. O Edital poder\u00e1 ser retirado na Sala de Licita\u00e7\u00f5es, no portal eletr\u00f4nico do munic\u00edpio www.guarai.to.gov.br ou ser requisitado via e-mail: licitacao@guarai.to.gov.br  Guara\u00ed\/TO, 20 de julho de 2022.  Cleube Roza Lima Superintendente de Licita\u00e7\u00f5es    RETIFICA\u00c7\u00c3O DA RESOLU\u00c7\u00c3O N\u00ba 010\/2022 DE 14 DE JULHO DE 2022.   Onde se l\u00ea:  Art. 1\u00b0 - Nomear o Comit\u00ea de Gest\u00e3o Colegiada de Prote\u00e7\u00e3o da Crian\u00e7a e Adolescente v\u00edtima e testemunha de viol\u00eancia do Munic\u00edpio de Guara\u00ed-TO.  Representante da Secretaria Municipal de Sa\u00fade: Aldeniza Gomes de Oliveira Porto Marcela Van De Kampe Funck Thomaz   Leia-se:  Representante da Secretaria Municipal de Sa\u00fade: Aldeniza Gomes de Oliveira Porto Daniela Almeida Silva    CMDCAG\">.<\/a><\/p>\n\n\n\n<p>BAIXAR PDF: <a href=\"https:\/\/guarai.to.gov.br\/portal\/wp-content\/uploads\/2022\/07\/DOM-1417.pdf\">Edi\u00e7\u00e3o Ordin\u00e1ria 1.417 de 20 de julho de 2022<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>. BAIXAR PDF: Edi\u00e7\u00e3o Ordin\u00e1ria 1.417 de 20 de julho de 2022<\/p>\n","protected":false},"author":28,"featured_media":31680,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[90],"tags":[197],"class_list":["post-44025","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-diario-oficial","tag-diario-oficial","entry"],"_links":{"self":[{"href":"https:\/\/guarai.to.gov.br\/portal\/wp-json\/wp\/v2\/posts\/44025","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/guarai.to.gov.br\/portal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/guarai.to.gov.br\/portal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/guarai.to.gov.br\/portal\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/guarai.to.gov.br\/portal\/wp-json\/wp\/v2\/comments?post=44025"}],"version-history":[{"count":1,"href":"https:\/\/guarai.to.gov.br\/portal\/wp-json\/wp\/v2\/posts\/44025\/revisions"}],"predecessor-version":[{"id":44027,"href":"https:\/\/guarai.to.gov.br\/portal\/wp-json\/wp\/v2\/posts\/44025\/revisions\/44027"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/guarai.to.gov.br\/portal\/wp-json\/wp\/v2\/media\/31680"}],"wp:attachment":[{"href":"https:\/\/guarai.to.gov.br\/portal\/wp-json\/wp\/v2\/media?parent=44025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/guarai.to.gov.br\/portal\/wp-json\/wp\/v2\/categories?post=44025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/guarai.to.gov.br\/portal\/wp-json\/wp\/v2\/tags?post=44025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}